Robotics & Lab Automation Resources

How to choose an OEM manufacturing partner for laboratory robotics

When you ask us to quote an OEM build, the first job is to mark up the work package together. Which mechanical parts do you need us to manufacture? Who supplies the base and arm? What must be connected, calibrated and tested before handover? Ask the same questions of every supplier so you can compare the same scope.

Can both teams describe the same scope?

Use the bill of materials to mark each item as customer-supplied, supplier-sourced, assembled, programmed, tested or excluded. Include the interface and test work as well as the physical parts. Otherwise, two quotations can describe the same robot while covering different amounts of work.

For a mobile manipulator, one supplier might quote a structural assembly while another assumes a complete integrated robot. Compare identical boundaries before comparing price or schedule.

AreaAsk forWhat to look for
AssemblyA relevant, anonymized process exampleClear instructions, critical checks and a realistic production sequence.
Supply chainApproved sourcing and substitution rulesAn accountable process for parts affecting fit, function or validation.
QualityA unit record and nonconformity exampleConfiguration linkage, disposition and release authority.
TestingA representative test plan and result formatDefined setup, measurable acceptance and exception handling.
ChangesAn engineering-change exampleDocument revision, stock impact and first affected unit.
ConfidentialityAgreed information access and permitted useProtection of designs and customer identity across subcontractors.

How do you distinguish evidence from a claim?

A factory photograph can show an activity, but it cannot alone establish process capability. Ask what product or operation the evidence represents, which part is relevant to your build and whether it can be reviewed without exposing another customer’s information.

A certificate also needs context: legal entity, site, scope and relevance to the proposed work. Do not transfer conclusions from unrelated industrial products to a laboratory robotics assembly. Refusal to disclose another customer’s confidential design is compatible with good OEM practice; ask for an anonymized alternative.

Pilot build objectives

Set pilot objectives before ordering. Typical questions include whether the drawing set is complete, whether assembly-critical steps can be repeated and whether the acceptance plan detects the faults that matter. Define who closes each finding and which documents must change.

Choose pilot quantity and timing from product risk and manufacturing maturity, not from a generic promise. Agree the conditions for production release, including unresolved deviations and component availability.

Who controls design and future changes?

  • Ownership and permitted use of product drawings and fixtures.
  • Approval of substitutions and deviations.
  • Software and firmware configuration responsibility.
  • Subcontractor access to technical files.
  • Retention and delivery of manufacturing records.
  • Service information, spares and disposition of obsolete parts.

Separate one-time work from the unit cost

Compare the same design revision, quantities and acceptance boundary. Ask each proposal to identify assumptions explicitly so that an omitted operation is not mistaken for a cost saving.

Commercial work packageItems to separate
Engineering and transferDesign review, documentation preparation, unresolved development work and engineering change allowance.
One-time production preparationFixtures, tooling, test equipment adaptation, ownership and maintenance responsibility.
Recurring unit scopeMaterials, purchased systems, assembly, inspection, configuration, test and packaging.
Externally supplied itemsCustomer components, software licences, supplied fixtures and their required availability.
Delivery and acceptanceShipment preparation, installation, factory and site acceptance, training and spares where included.
Future changesSubstitution approval, revision transition, obsolete stock and repeat verification after changes.

A meaningful comparison records what is included, excluded and conditional. Keep target lead time separate from the committed schedule, and tie any volume assumptions to the actual release plan.

How can qualification findings lead to a decision?

Keep a short record of what you have actually reviewed. For each required operation, note the evidence, the product or process it applies to and anything still unanswered. The following labels help keep a missing record distinct from a reviewed one:

  • Supported: applicable evidence has been reviewed and meets the agreed criterion.
  • Partially supported: some evidence exists, but the product, process or site difference still needs to be addressed.
  • Unverified: the claim has not yet been supported by reviewable evidence.
  • Outside scope: another named party owns the operation and its acceptance.

Assign an owner and a closure condition to each material gap. Use the pilot build to answer the remaining manufacturing questions, then decide whether to proceed, revise the scope or request further evidence.

What is enough for a first manufacturing conversation?

You do not need to share all proprietary design files immediately. Begin with the product category, development stage, intended markets, approximate quantities and the work you want to outsource. Add non-confidential interface information and the acceptance evidence you expect.

When you contact us, we review the mechanical parts, selected base and arm, device connections, platform interface and calibration together. We agree which drawings and test records your team needs for the hardware it intends to buy.

Common questions

Should the lowest quotation decide the supplier?

Compare the same scope, acceptance obligations and assumptions first. A missing integration or testing work package can make a low quotation misleading.

Can an OEM retain scheduling software and outsource the hardware platform?

Yes. This is LabCarry’s core cooperation model: we manufacture the mechanical hardware, integrate sourced bases and arms, complete hardware/firmware connections and platform interfaces, and perform assembly and calibration. Your team connects its own scheduling software through the agreed interface.

What should stop a production release?

Unresolved product requirements, uncontrolled drawings or no agreed acceptance evidence should be addressed before release. The precise gate belongs in the project plan.

What if evidence is confidential?

Ask for an anonymized record, a controlled review or another agreed demonstration that preserves customer information while answering the qualification question. We agree what evidence is available and whether an anonymized record or controlled review can answer the question while protecting customer information.

Discuss your hardware requirements

Send us your carrier dimensions, workstation layout, software interface requirements and expected quantities.

Discuss an OEM Project